Date |
Day |
No. |
Discussion |
Reading, Videos, Articles, & Resources |
Homework |
 |
8/23 |
T |
1 |
Intro to Electrical Construction Estimating |
How to Estimate Electrical Work |
|
|
|
|
|
Estimating Toolkit |
How to Become a Successful Electrical Estimator |
|
|
|
|
|
Codes - Standards - Organizations |
|
|
|
|
North State Electric Forms |
NECA Labor Factor Score Sheet |
|
|
|
|
Take Off Color Codes |
|
|
|
|
|
|
Estimate Setup Package (F102 REV5) |
Electrical Systems |
|
|
|
|
|
Take Off Sheet |
|
|
|
|
|
|
Feeder Take Off Sheet |
|
|
|
|
|
|
Motor Branch Take Off Sheet |
|
|
|
|
|
|
Pricing Sheet |
|
|
|
|
|
|
|
Electrical Material Resources |
|
|
|
|
|
In Class Activity |
Grainger |
|
|
|
|
|
Office Plan |
Hubbell |
|
|
|
|
|
Office Plan Colored |
General Cable |
|
|
|
|
|
Office Plan Take Off Sheet |
Erico |
|
|
|
|
|
Office Plan Take Off Sheet Answers |
Lowes |
|
|
|
|
|
Office Plan Take Off Sheet_Exploded |
Home Depot |
|
|
|
|
|
|
 |
|
|
|
|
|
Estimating Conductor Length |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Installing and Running Accubid Pro 15 |
|
|
|
|
|
|
GlobalProtect (VPN Software) |
|
|
|
|
|
|
Accubid Classic Pro - Trimble |
|
|
|
|
|
|
Databases |
|
|
|
|
|
|
|
|
|
|
8/25 |
R |
2 |
Setting up the Estimate Binder |
|
|
|
|
|
Accubid Office Building |
|
|
|
|
|
Plans |
|
|
|
|
|
Specifications - DIV 16 |
|
|
|
|
|
Cutsheets |
|
|
|
|
|
|
|
|
|
Accubid Act #1- Getting Started with Accubid Pro. AOB Setup |
|
|
|
|
|
|
|
 |
8/30 |
T |
3 |
Division 26 51 00: Interior Lighting |
|
|
|
|
|
Division 26 05 23: Control-Voltage Electrical Power Cables |
|
|
|
|
Division 26 56 00: Exterior Lighting |
|
|
|
|
|
|
|
|
|
|
|
|
|
CBES - Lighting |
|
|
|
|
|
|
|
|
|
|
|
|
06 FIXTURES |
Addendum #1 |
|
|
|
|
|
39 LIGHTING CONTROL/DIMMING |
Addendum #2 |
|
|
|
|
|
43 SITE LIGHTING |
Tork Lighting Control |
|
|
|
|
|
|
|
|
|
|
9/1 |
R |
4 |
Request for Quotes (RFQ) - NSE |
|
NEW! |
|
|
|
|
|
NSE RFQ Policy |
RFQ FORM |
Right Click and "Save Link As" to your hard drive |
|
|
|
|
|
AOB RFQ FIXTURES AND LIGHTING CTRL |
|
|
|
|
|
|
|
AOB Fixture Count |
|
|
|
|
|
|
|
E6.1 Fixture Schedule |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Accubid Activity Act #2 - 06 FIXTURES |
|
|
|
|
 |
9/6 |
T |
5 |
Division 26 27 00: Low-Voltage Distribution Equipment |
|
|
|
|
|
08 DEVICES - LIGHTING |
|
|
|
|
|
13 DEVICES - POWER |
|
|
|
|
|
Accubid Act #5 - Job Report Styles |
|
|
|
|
|
Example Job Report -Extension Screen Grouped by SYSTEM and PHASE |
|
|
|
|
|
|
|
|
9/8 |
R |
6 |
Accubid Act #3 - SYS 08 DEVICES - LIGHTING & SYS 13 DEVICES – POWER |
|
|
 |
9/13 |
T |
7 |
Division 26 24 00: Switchboards and Panelboards |
|
|
|
|
|
Accubid Office Building One-Line Diagram |
|
|
|
|
01 SWITCHGEAR |
|
|
|
|
|
|
|
|
|
|
|
|
Eaton Article - Basics of low voltage distribution equipment |
|
|
|
|
|
Panelboards Siemens |
|
|
|
|
|
|
Switchboards Siemens |
|
|
|
|
|
Switchgear and Switchboard |
|
|
|
|
|
Article 310 - Table 15 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Power Distribution |
PPT |
|
|
|
|
|
|
|
|
|
|
|
|
|
Round House Combinations |
|
|
|
|
|
Power Terms - Feeders |
Answers |
|
|
|
|
|
Power Terms - Branch Circuits and Motors |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
9/15 |
R |
8 |
Accubid Act #4 - SYS 01 SWITCHGEAR |
|
|
 |
9/20 |
T |
9 |
26 05 19: Low-Voltage Electrical Power Conductors and Cables |
|
|
|
|
|
04 FEEDERS |
Addendum #3 |
|
|
|
|
|
05 MOTOR BR BRANCH/EQUIP. CONNECT |
E3.3 w/ADD#3 |
|
|
|
|
|
|
|
|
|
|
|
9/22 |
R |
10 |
Accubid Act #6 - SYS 04 FEEDERS |
|
|
|
|
|
Accubid Act #7 - SYS 05 MOTOR BR BRANCH/EQUIP. CONNECT |
|
|
|
|
|
|
|
|
|
|
|
|
Accubid Office Building - Motors.ES15 |
Right Click and "Save Link As" to your Hard Drive |
|
|
|
|
|
|
|
|
 |
9/27 |
T |
11 |
Branch Layout: |
|
|
|
|
|
21 FIRE ALARM SYSTEM |
Addendum #4 |
|
|
|
|
|
|
E4.4 w/ADD#4 |
|
|
|
|
|
|
|
|
|
|
|
|
07 LIGHTING BRANCH |
Addendum #5 |
|
|
|
|
|
12 POWER BRANCH |
|
|
|
|
|
|
|
|
|
|
|
|
9/29 |
R |
12 |
Accubid Activity #8 - 21 FIRE ALARM SYSTEM |
|
|
|
|
|
Accubid Activity #9 - 07 LIGHTING BRANCH |
|
|
|
|
|
Accubid Activity #10 - 12 POWER BRANCH |
|
|
 |
10/4 |
T |
13 |
Division 26 05 36: Cable Trays for Electrical Systems |
|
|
|
|
|
16 CABLE TRAY |
|
|
|
|
|
|
|
19 TELE/DATA CONDUIT |
|
|
|
|
|
38 GROUNDING |
|
|
|
|
|
|
44 INCOMING SERVICE - POWER |
|
|
|
|
|
|
45 INCOMING SERVICE - TELEPHONE |
|
|
|
|
|
|
|
|
|
|
10/6 |
R |
14 |
Accubid Activity #11 - 16 CABLE TRAY and 19 TELE/DATE CONDUIT |
|
|
|
|
|
|
|
|
|
|
|
Accubid Activity #15 - Temporary Items |
|
|
|
|
|
Accubid Activity #16 - 38 GROUNDING |
|
|
|
|
|
|
|
|
|
|
|
Accubid Activity #17 - Temporary Assemblies |
|
|
|
|
|
Accubid Activity #18 - 39 LIGHTING CONTROL |
|
|
 |
10/11 |
T |
15 |
Plumbing Overview. Domestic Hot/Cold Water and Fixtures |
|
|
|
|
Autobid Activity #1 - Setting Up Trimble Autobid Mechanical On Screen Take Off |
|
|
|
|
|
|
|
|
10/13 |
R |
16 |
Autobid Activity #2 - H/CW and Fixtures QTO |
|
|
 |
10/18 |
T |
17 |
Plumbing DWV |
|
|
|
|
|
|
|
|
|
|
|
|
|
10/20 |
R |
18 |
Autobid Activity #3 - DWV QTO |
|
|
|
|
|
 |
10/25 |
T |
19 |
Plumbing Natural Gas, HHW and Boilers |
|
|
|
|
|
|
|
|
10/27 |
R |
20 |
Activity #4 - NG, HHW and Boilers QTO |
|
|
 |
11/1 |
T |
21 |
Accubid Activity #12 - 44 INCOMING SERVICE - POWER |
|
|
|
|
|
Accubid Activity #13 - 45 INCOMING SERVICE - TELEPHONE |
|
|
|
|
Accubid Activity #14 - 43 SITE LIGHTING |
|
|
|
|
|
|
|
|
11/3 |
R |
22 |
Electrical Estimate Takeoff Due - Report Style Grouped by SYSTEM |
|
|
 |
11/8 |
T |
23 |
Mechanical Piping CHW and Chillers |
|
|
|
|
|
|
|
|
|
|
|
11/10 |
R |
24 |
Activity #5 - CHW and Chillers QTO and Piping Wrap-up |
|
|
 |
11/15 |
T |
25 |
Sheet Metal Overview, Supply and Return Air and Equipment |
|
|
|
|
|
|
|
|
|
|
11/17 |
R |
26 |
Activity #6 - SA/RA QTO |
|
|
|
|
|
 |
11/22 |
T |
27 |
Thanksgiving Break - No Class |
|
|
|
|
|
|
|
|
|
|
|
11/24 |
R |
28 |
Thanksgiving Break - No Class |
|
|
|
|
 |
11/29 |
T |
29 |
Sheet Metal Exhaust and Equipment |
|
|
|
|
|
|
|
|
|
|
|
12/1 |
R |
30 |
Activity #7 - Exhaust Air QTO and Ductwork Wrap-up |
|
|
|
 |
12/6 |
T |
31 |
AOB Final Estimate Cleanup and Bid Summary |
|
|
|
|
|
Accubid Activity #19 - Estimate Cleanup |
|
|
|
|
|
|
Accubid Activity #20 - Bid Summary |
|
|
|
|
|
|
AccubidActivity #21 - Final Pricing |
|
|
|
|
|
Accubid Activity #22 - Exporting to MS Project |
|
|
|
|
|
|
|
|
|
12/8 |
R |
32 |
AOB Final Pricing and Bid Due |
|
|
|
 |
|
|
|
Final Exam |
|
|
|
|
|
|
TBD |
|
|
|
|
|
|
|
|
|
|
|
|
|
|